Wednesday, December 1, 2010

december framing

moment frames got installed.
the knock out to receive the track at the slab needs to be redone.




the forecast looks dry throughout the week, the goal is to tie to the existing structure by saturday, and have
it dryed in by the middle of next week.
there's a corncern about clearance for the rigid a/c duct right above the kitchen because of an structural beam, we need to meet with the mechanical sub early next week.