spring



spring is here. nana doors are installed. there are some electrical adjustments to be made before insulation
gets here next week.



roofing is done, metal siding will go up by the end of the week. there's some tpo on the flat roof installed and some flashing at the clearstories.
once the colors are set and the soffitt is placed it will look very different.


we are looking into a finish decking surface for the courtyard, around the pool and the outdoor space off the master bedroom .  drain will be provided below, we are leaving 1/2" gaps between boards.