Wednesday, December 22, 2010

426 Mission mid dec. framing

we have finally connected the two structures and taken down the dividing walls.
today we figured out the lighting in order to leave the ceilings of the addition ready for the led's.


this view is from the original house front door down the hallway, with the addition on the background.
and here is a view from the end of the hallway...



connection at guest/study room;


No comments:

Post a Comment