Monday, September 26, 2011

Leigh St

Under construction
The site prep and foundation work were done a couple of weeks ago


The steel half of the structure is up, wd. framing will start this week.


Here's some images of the schematic design presented to the hdrc. The design is a conceptual extension of the two structures flanking the site, thus filling up the vacant site gap.



here's another image from the same angle


the steel structure we see, is the open covered terrace on the left side of the design.